Revamping and upgrading of existing plants
In addition to building new plants, Buiago offers its experience for revamping and upgrading of glue preparation units already installed, with the aim of extending their service life and improving performance, reliability, safety and maintainability.
The approach is developed through an analysis of the existing plant, identifying the most technologically and economically effective interventions and reducing, as far as possible, the impact on production.
Where we can intervene
Revamping can involve the entire preparation system, intervening in a targeted way on the different components that make up the plant.
Electrical revamping
Replacement or upgrading of the power, command and control electrical panel, the electrical equipment and the related protection and management devices.
Software and automation revamping
Upgrade or replacement of the PLC, the HMI system and the management and control logic of the preparation unit, with the possibility of implementing new functions, recipes, alarm management, monitoring and historical logging of process data.
Mechanical revamping
Overhaul, replacement or upgrading of mechanical parts and equipment that show wear, obsolescence or performance no longer adequate for production needs.
Hydraulic revamping
Includes, as required, pipes, valves, pumps, measuring instruments, dosing systems and other components of the preparation and fluid handling circuit.
Measurement and control systems
Upgrading and integration of measurement and control systems, to make the process more precise, stable and easy to monitor.
Recover what works, upgrade what is needed
Thanks to a tailored design approach, it is possible to recover and make the most of the parts of the plant that are still efficient, intervening instead on the components that need updating or replacement.
This solution makes it possible to obtain a technologically up-to-date preparation unit without necessarily replacing the entire plant, with important advantages in terms of:
The result is a plant renewed from an electrical, software, mechanical and hydraulic standpoint, more reliable and easier to maintain, equipped with up-to-date control systems and ready to meet current production needs.